Construction & Planin

We are very strongly focusing on research and development. 2% of the yearly turnover are invested here. Beside improvement of the efficiency factor and increase of operating life of the current modules, new developments and technologies as for example ORC or steam processes are at the top of the agenda.

Since the beginning of the year, the new SEVA Vista control has been serially installed into the modules. In this new control, extensive experience like e.g., optimal energy utilization, mains parallel operation mode, and remote data transmission is mirrored.

Also, the SEVA-developed sound-damping containers are optimized and advanced.

Our experience of long standing, as for example the optimal utilization of energy and net-parallel operation, is mirrored in our electronic controls. Moreover, the entire mechanical engineering and structural steel work, the production and assembly of individual components of heating technology, as well as the construction of heat exchangers take place in our own company.

Furthermore, we carry out the coiling of generators and the putting into operation of diesel engines. We install all necessary components for co-generation sets all the way to thermal insulation, and install sound-absorbers into mobile containers or into engine rooms provided by third parties. Containers can be put up at the operator's place without making high demands on space.